高(gao)溫翻闆卸灰閥,适(shì)用于建材、冶金、礦(kuàng)山、石化、水泥、電力(lì)⚽等行業。用于物料(liào)加工、運輸、篩選等(deng)系統中的物料調(diao)節🐇和吸收、緩解物(wu)料從高處下落所(suo)産生的沖擊及粉(fěn)塵飛揚。能使物料(liào)均🏃♀️勻、平穩、規則地(dì)緩緩溜到受料裝(zhuang)置上或下道工序(xu)。
Structure characteristic:
高溫翻(fan)闆卸灰閥,是在總(zong)結以往各類型物(wu)料卸灰設備的🌐基(ji)🔴礎㊙️上研制開發的(de)新式、先進的系列(liè)産品。
高溫翻(fan)闆卸灰閥,結構上(shang)采用可維修、可拆(chai)卸,其閥軸、翻🌈闆、搖(yáo)杆、重錘可随檢查(cha)蓋闆一起卸下,便(biàn)于用🏃🏻戶使用和維(wei)護。
The valve is the neo-modern and most advanced product designed on the base of summary of all kinds of material discharging device.
The valve can be maintained and disassembled. The axle, turning-disc, rocker and heavy hammer can be disassembled with observation cover plate, which make the use and maintenance more convenient.
性能參數:
工作壓力 Working pressure | 适(shi)用溫度 Suitable temperature | 适用(yòng)介質 Suitable medium |
0.05MPa | 1000 | 粉料、粉塵、顆粒(li)等物料 |
襯裡材料(liao)參數:
Lining material parameter:
耐火度(du)℃ Refractoriness | Volume density | 抗壓強度 Anti-pressure intensity | 抗折強度 | ||||||
℃ | 815℃ | 110℃ | 815℃ | 110℃ | ℃ | ||||
2.5 | >2.5 | 70 | 10 | ||||||
工作原理(lǐ):
Working principle:
高溫翻闆卸灰閥(fa)密封腔體容器内(nèi),設有可自動開啟(qi)、關閉,轉動靈活可(ke)靠并具有抗沖擊(ji)、抗振動、耐磨損能(néng)力的翻闆。翻闆的(de)運行由帶有一重(zhòng)錘的連杆來實現(xian),連杆及重錘處于(yu)閥體兩側。
利用力(li)矩平衡的原理實(shi)現工作。即當作用(yòng)于翻闆上的物料(liào)産生的力矩大于(yú)重錘搖杆産生的(de)力矩時,翻闆自行(hang)打開物料順着翻(fān)闆開口自然、均勻(yun)、平穩地溜下,一旦(dàn)🈲積料卸去後重錘(chui)與搖杆産生的力(li)矩使翻闆迅速關(guan)閉。
There is turning-disc in the sealed body of the valve, which can open, close automatically and has the features of reliable and handy rotation, anti-impact, anti-shock and antifriction. The turning-disc is driven by the connecting rod with a heavy hammer. The connecting rod and heavy hammer are on both sides of valve body.
The moment balance is used in the working principle. That is to say the turning-disc will open automatically when the moment on the disc is more than that of heavy hammer and rocker, then the material will slide on the disc opening naturally and smoothly. The moment made by heavy hammer and rocker will close the turning-disc quickly when the material is discharged.
安裝及調試:
l 安裝前空運(yùn)行幾次,查看各傳(chuan)動部分是否運轉(zhuan)靈活。
l 根據用戶工況(kuàng)調整重錘在搖杆(gan)的位置。
l The body must be cleaned before installed and there is no dirt and sundries clinging to the body. The transmission device cannot be hoisted and avoid damage when installed.
l Several idle running must be done before install and check the operation flexibility of transmission parts.
l The connection type of this valve is flange connection. Add sealed shim between the two flanges before install and then lock down the connection bolt.